See List of Projects
- These include the 1st NEC project in HK and the first to use NEC Option C Target Cost contract
- Fuk Man Road with Cost saving: 5% and Time saving: 6 months advance completion. We provided NEC advisory services (2009-2012)
- Happy Valley project (2012-2018) with cost saving: 110 million (10%) and time saving: 14 months advance completion.
NEC Experience in Hong Kong
NEC Pre-Contract Advisor providing advice on tender preparation, explaining NEC concepts and resolving comments
- EMSD Consultancy CE77/2017(EM) The District Cooling System for Tung Chung New Town Extension (East) – Design and Construction (NEC4 DBO)
- CEDD Consultancy CE70/2015(CE) Tung Chung New Town Extension (West) – Design and Construction (NEC4 ECC Option C)
- CEDD Consultancy CE8/2022(CE) Site Formation and Infrastructure Works for Public Housing Development at Sha Po, Shap Pat Heung and Tai Kei Leng, Yuen Long (NEC Option C with Early Contractor’s Involvement)
- ArchSD Consultancy 9AF112 – A 30-classroom Primary School at Site KT2c, Development at Anderson Road, Kwun Tong (ECC Option C)
- WSD Consultancy CE 66/2021(WS) Improvement Works to Fresh Water Mains with Internal Bitumen Lining – First Package of High Priority Mains in Hong Kong & Islands and Kowloon - Investigation, Design and Construction (ECC Opt C with Early Contractor’s Involvement)
- WSD Consultancy CE 15/2018(WS) Relocation of Diamond Hill Fresh Water and Salt Water Service Reservoirs to Caverns – IDC (ECC Opt C)
- WSD Consultancy CE 88/2021(WS) Relocation of Yau Tong Group Fresh Water and Salt Water Service Reservoirs to Caverns – IDC (ECC Opt C with with Early Contractor’s Involvement
- MTR Contract 1262 Automatic Fare Collection System (ECC Opt C with with Early Contractor’s Involvement)
NEC TSC Post-Contract Advisor advising the use of NEC TSC contracts in the post-contract stage and facilitating risk reduction meetings for effective problem resolution
- ArchSD Consultancy ASD/PSB/SD1/NEC/2019 – Advisory Services on Adopting NEC for the Administration of Slope Maintenance Term Contract TC H938 (Post-contract) (TSC Option A)
- ArchSD Consultancy ASD/PSB/SD31/NEC/2021 – Advisory Services on Adopting NEC for the Administration of Slope Maintenance Term Contract TC K928 & 929 (TSC Option A)
- WSD Contract 5/WSD/21 Term Contract for Risk-Based Improvement of Small Water Mains – New Territories East (TSC Option A)
- WSD Term Contracts 1/WSD/21(E) & (W) and 1/WSD/23(L) Term Contract for Waterworks
NEC Post-Contract Advisor managing partnering relationships, reviewing contractual issues and independent programme facilitation
- ArchSD Contract SS K526 Primary School at Site KT2c, Anderson Road (NEC3 Opt B)
- ArchSD Contract SS M503 Anderson Joint User Complex (NEC3 Opt A)
- ArchSD Contract SS K520 Redevelopment of Yuen Long Stadium (NEC3 Option B)
- CEDD Contract SD/2021/02 Boardwalks underneath Island Eastern Corridor (NEC4 Opt C)
- CEDD Contract CV/2016/10 and CV/2017/02 Site Formation and Associated Infrastructural Works for Development of Columbarium at Sandy Ridge Cemetery (ECC Opt C)
- CEDD Contract No. CV/2018/03 and CV/2017/07 Site Formation and Infrastructure Works for Development Works at Wang Chau, Yuen Long (ECC Opt C)
- CEDD Contract CV/2022/07 Site Formation and Infrastructure Works at Long Bin, Yuen Long – Phase 2 (ECC Opt C)
- CEDD Contract CV/2023/15-17 Site Formation and Infrastructure Works at Kwok Shui Road, Tsing Yi West and Tin Wah Road
- CEDD Contract NL/2020/05 and 06 Tung Chung West Developments (ECC Opt C)
- CEDD Contract YL/2015/01 Cycle Tracks from Tuen Mun to Sheung Shui (ECC Opt B)
- CEDD Contract YL/2017/01 Site Formation & Infrastructure Works Kam Tin South (ECC Opt C)
- CEDD Contracts YL/2023/01 – 04 Hung Shui Kiu/ Ha Tsuen New Development Area – Site Formation and Infrastructure Works (ECC Opt C)
- CEDD Contract IS/2022/02 Improvement Works at Mui Wo, Phase 2 Stage 2 (ECC Opt B)
- DSD Contract DC/2018/08 Inter-reservoir transfer scheme (ECC Opt C)
- DSD Agreement 63/2013(DS) Drainage Improvement in Happy Valley – IDC (ECC Opt A)
- DSD Contract DC/2022/03 Yuen Long Barrage and Nullah Improvement Schemes (ECC Opt C)
- DSD Contract DC/2021/04 Construction and Rehabilitation of Trunk Sewage Rising Mains in Yuen Long and Yau Tong
- DSD Contract DC/2023/05 Structural Improvement of Sewers and Stormwater Drains Package 1A
- DSD Contract DC/2024/06 Shek Kip Mei Stormwater Storage Scheme and Drainage Improvement Works in Eastern District and Lei Yue Mun
- EMSD Contract 1330EM20A DCS at Kwu Tung North NDA Phase 1 – DCS Pipe Laying and Associated Works (ECC Opt B)
- EPD Contract EP/SP/186/21 West New Territories Landfill Extension (NEC4 DBO)
- HyD Contract HY/2018/02 Central Kowloon Route – Kai Tak East (ECC Opt C)
- HyD Contract HY/2019/04 Widening of Lin Ma Hang Road (ECC Opt B)
- HyD Contract HY/2018/11, HY/2019/12,1 HY/2020/09, HY/2022/08 and HY/2022/12 Provision of Universal Accessibility Facilities at Footbridges (ECC Opt A, B & C with ECI)
- HyD Contract HY/2022/16 Pedestrian Connection between Tamar Footbridge (Highway Structure No. HF189) and Admiralty Centre (ECC Opt B)
- WSD Contract 2/WSD/23 Improvement of Fresh Water Supply Systems in Sham Sui Po, Eastern, Central and Western Districts
- WSD Contract 3/WSD/23 Improvement of Fresh Water Mains with Internal Bitumen Lining – NT East and West – Stage One
- WSD Contract 12/WSD/24 Term Contract for Improvement of Water Mains HK & Islands
- WSD Contract 5/WSD/19 Improvement of DJ Mains P4 at Sheung Shui & Fanling (ECC Opt C)
- WSD Contract 4/WSD/17 Uprating of Tung Chung FW Supply System (ECC Opt A)
- WSD Contract 3/WSD/17 Term Contract for Risk-Based Improvement of Water Mains – Hong Kong & Islands and New Territories West (ECC Opt B)
- WSD Contract 13/WSD/16 Mainlaying in Tseung Kwan O (ECC Opt C)
- URA Contract DL-11:YTM Proposed Composite Development at Nos. 5 – 13 Ash Street, Tai Kok Tsui, Kowloon (ECC Opt B)
- WKCDA Contract No. CC/2022/05/094 Main Works Contract for Southern Landing Facility at West Kowloon Cultural District (ECC Opt B)